Allocation of non-hydro renewable portfolio standard targets among China’s provinces based on bi-level programming approach
编号:242 稿件编号:13 访问权限:仅限参会人 更新:2022-05-12 15:24:18 浏览:821次 口头报告

报告开始:2022年05月27日 08:30 (Asia/Shanghai)

报告时间:20min

所在会议:[S3] Energy and Sustainable Green Development » [S3-2.4] Energy and Sustainable Green Development-2.4

暂无文件

摘要
The development of renewable energy power is a critical driving force for China’s energy structure’s reform. Formulating a scientific renewable portfolio standard (RPS) quota allocation scheme is a crucial guarantee for achieving the 2030 carbon peak and the 2060 carbon neutrality goal. Based on the complex dynamics of China's RPS quota allocation game process and the current industry management system, and considering the heterogeneity of the benefits between the central government and local governments, a new provincial non-hydro renewable portfolio standard (NHRPS) quota allocation model based on bi-level multi-objective nonlinear programming is required. Based on data from 30 provinces in China, an optimal distribution scheme that considers cost, environment, and fairness were obtained. The results show that because of the differences in energy substitution costs and emission reduction costs between provinces, the implementation intentions of various provinces show great differences in the implementation of the indicator tasks assigned by the central government. The comparative analysis results show that compared with the government’s current distribution scheme, the bi-level optimized distribution scheme saves 4.222 billion yuan in subsidy costs, 259.512 billion yuan in energy substitution costs, and 79.139 billion yuan in emission reduction costs. Meanwhile, the Gini coefficient of the bi-level optimal distribution scheme is less than 0.2, which indicates absolute fairness. The NHRPS quota allocation model proposed in this research reflects the complex dynamics of China’s RPS quota allocation scheme and formulates a more effective and reasonable decision-making tool and reference for the government to formulate an NHRPS quota scheme.
关键字
renewable portfolio standard,bi-level multi-objective programming,quota allocation
报告人
Chunxiao LI
China University of Mining and Technology

稿件作者
春晓 李 中国矿业大学经济管理学院
德鲁 王 中国矿业大学经济管理学院
学锋 宋 中国矿业大学